Over the winter months M O'Brien Plant Hire has been working closely with Costain on their network rail London Bridge project. We played our part in the laying of new track during some tight closure times.
5 Brand new Hitachi 135 dash 5 tier 3b excavators were delivered to the site and were piloted by a carefully chosen team from our top class of operators.
The machinery was lifted in front of the iconic London Shard and down to track level where work would commence to replace the track.
The rail was lifted in sequence using our special universal lifting beams for maximum control and accuracy, making the operation as safe as possible. Our low emission Tier 3B machinery made the work easy and kept the air clean with personnel working in close proximity.